Migrate a Drupal stack to a newer major version

An app can continue to show an older Drupal stack after its codebase has been upgraded to a newer Drupal major version. The app-level stack migration updates that platform configuration and redeploys every instance on the managed stack for the selected Drupal generation.

Supported transitions are:

  • Drupal 8 to Drupal 9, 10, or 11.
  • Drupal 9 to Drupal 10 or 11.
  • Drupal 10 to Drupal 11.

Upgrade Drupal before migrating the stack

Stack migration does not update Drupal core, Composer dependencies, custom code, contributed modules, the database schema, or files. Upgrade and test the application itself first. Start migration only when the code and data on every instance are compatible with the selected Drupal major version.

What migration changes

Migration changes the existing app in place. It does not create another app or copy application data.

For every instance, Wodby creates a new stack revision derived from the current managed target stack, preserves compatible service choices and configuration, switches the instance to that revision, and redeploys it. The app's Drupal type is updated only as part of the same app-wide operation.

When a manually configured NGINX_VHOST_PRESET or DRUPAL_VERSION value already matches the target generation, the redundant override is removed so the target stack's defaults become authoritative. A conflicting value blocks migration instead of being silently discarded. Other compatible environment variables and secrets are preserved.

Requirements and preflight

Stack migration is available for eligible Drupal 8, 9, and 10 apps. The dashboard checks the entire app before it enables the migration:

  • The source must use an official stack derived from the app's current Drupal generation.
  • The target must be the current managed stack for a newer Drupal generation in the same organization.
  • Every app instance must be in OK status and have no pending stack revision.
  • Every instance server must satisfy the target stack's infrastructure requirement.
  • Apps with CI-based instances are currently not eligible.
  • Enabled services that do not exist in the target stack block migration.
  • Database, search, or Zookeeper implementation changes that require a data migration are not performed automatically and block migration.
  • Conflicting Drupal or Nginx identity overrides block migration.

Disabled services that no longer exist can be removed with a warning. The preflight page shows the target, blockers, warnings, and planned changes for each instance before anything is modified.

Prepare the app

  1. Upgrade the Drupal codebase and dependencies using Drupal's supported major version upgrade process.
  2. Apply the required Drupal database updates and configuration changes.
  3. Deploy and test the upgraded application on every instance while it still uses the old stack metadata.
  4. Create current database-and-files backups for important instances.
  5. Release or discard pending stack changes and make sure every instance is in OK status.
  6. Plan for a redeployment of every instance and the associated downtime.

If you temporarily set NGINX_VHOST_PRESET or DRUPAL_VERSION to run the newer code on the old stack, leave matching values in place for preflight. Migration recognizes and removes them when it switches to the corresponding target stack.

Run the migration

  1. Open the app in the dashboard.
  2. Go to Settings > Migrate. This is the app settings page, not an individual instance's settings page.
  3. Select the target Drupal stack.
  4. Review all app-level and per-instance blockers, warnings, and planned changes. Resolve blockers and reload the page until migration is available.
  5. Confirm that the application code is compatible with the selected Drupal version.
  6. Start migration and wait for the task to redeploy every instance.

Do not edit app or stack settings after reviewing preflight. If relevant state changes before the task starts, Wodby rejects the stale plan and asks you to reload it.

After migration

Verify every instance, including application pages, administrative pages, scheduled jobs, uploads, logs, and integrations. Confirm that the app now shows the selected Drupal generation and that the matching temporary identity overrides are gone.

If an instance deployment fails, the app is marked degraded and remains on the new stack revisions. Fix the deployment problem and redeploy the affected instances through the normal instance deployment workflow. Stack migration does not automatically roll the app back to its old generation.